Design Integration Laboratory

Architecture 484/584 - Spring 1996



Program Details -- New Public Library

(Note: Our building is intricate -- be clear about what is important. You will need to develop an organizing scheme to make a whole of the many parts.)


Program Outline | Building Code | Site Information


shared realm -- 900

entry -- welcoming and accessible -- 200

outside space, inside space

public services (restrooms, phones, drinking fountain) -- 100+

main circulation counter -- centrally located, always staffed, controls entry -- 150

cafette -- optional -- snacks for the info browsers, with counter and appliances -- 100

community meeting room -- may need independent access -- 320

drive-up book return -- could possibly be separated from main building -- 30

orientation and circulation space (~30%) (included in net/gross factor)

adult realm -- 5000

adult service desk and info counter -- always staffed, equipment loaned -- 100

equipment and special media storage -- 150

primary catalog area -- a central, comfortable terminal cluster -- 50

adult reading areas -- attractive and adaptive -- 1400

adult collection space -- fiction, non-fiction, books and other media -- 2700

primary adult stacks -- 1800
fiction section -- 650
new books -- area also includes paperbacks and large print -- 250

young adults collection -- may include reading spots -- 100

periodicals area -- display and reading -- 400

magazine display shelving -- 250

reference area -- reference librarians and materials -- 300

special collections -- extra level of control -- 60

patron equipment area -- xeroxing and other fixed machinery -- 20

children's realm -- 1350

children's service desk area -- always staffed -- 100

children's reading area -- children's scale, and adaptive -- 350

children's collection space -- preschool, young reader zones -- 700

reading spot -- for reading aloud, etc -- 200

staff realms -- 1050

circulation and technical services workroom -- intake and sorting of books -- 300


library director's office -- 150

staff offices -- 200

reception -- space for receptionist and waiting -- 75

administrative work area -- staff xeroxing, etc -- 120

copy and work area

conference room -- 160

staff lounge -- with kitchenette -- 120


volunteer space -- desk, table, lockers, bulletin board -- 40

storage -- various: books, equipment, supplies, carts, chairs, -- 50

building service realm -- 600

custodians room and shop -- lockers, sink, sitting table 150

janitor closets -- sink, storage on each building level -- 150

mech. rooms -- HVAC, electrical, communications, fire sprinkler controls -- 200

loading dock -- 100

TOTAL BUILDING -- 12000

net total (assignable spaces) -- 9000
unassignable areas -- 3000

parking -- 10 short-term spaces and handicapped


Studio Foyer | Example Studios | Architecture Curriculum | Architecture Foyer | Index
This document is provided for on-line viewing only, except as printed by Author.
© 1996 Kevin Matthews, All Rights Reserved.

http://www.dil.uoregon.edu/courses/96.2/studios/a584.s96.matthews /a584.s96.program.detail.html - Posted 96.04.15 KMM, rev. 96.04.15